My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11222
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:37 PM
Creation date
11/19/2007 2:18:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Application Correspondence
Doc Name
RECOMMENDATION OF APPROVAL OF THE ORCHARD VALLEY MINING & RECLAMATION PLAN COLO WESTMORELAND INC
From
OSM
To
OSM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />CO-0012 <br />• Page 7 of 13 <br />-3- <br />permit application as part of <br />report must be submitted to the <br />permit issuing. The applicant <br />contained in the CWI memorandum <br />Permit). <br />the vegetation appendix in Volume 7. This <br />Regulatory Authority within 30 days of the <br />shall comply with all of the provisions <br />dated November 3, 1981 (Attachment A of this <br />13. Within 60 days of permit issuance, Colorado Westmoreland, Inc. must <br />provide the Regulatory Authority with a specific crop production standard for <br />the orchard area. Pending Regulatory Authority approval, this standard will <br />be used in evaluating revegetation success within the orchard vegetation type. <br />14. Within 60 days of permit issuance, Colorado Westmoreland, Inc. must <br />provide the Regulatory Authority with an appropriate, justifiable shrub/tree <br />density standard which will be sufficient to meet the approved post-mining <br />land use for the reclaimed surface. This standard must be based upon a <br />recommendation from the surface land owners and Division of Wildlife, and must <br />include the findings of the technical references/sources used to establish <br />this standard. <br />15. Within 6 months after permit issuance, Colorado Westmoreland, Inc., in <br />consultation with Regulatory Authority, shall develop mutually acceptable <br />success criteria for species diversity on reclaimed areas. <br />16. Following stockpiling, topsoil stockpiles that will not be redistributed <br />for five or more years shall be seeded with the proposed permanent seed mix <br />(excluding shrubs and trees) and not the temporary seed mix. <br />17. Colorado Westmoreland, Inc. is directed to complete Phase II of the geo- <br />technical and stability analyses of its surface facilities area at the Orchard <br />Valley Mine, as outlined in the various Letters of proposal Erom Merrick 6 <br />Company and Geohydro Consultants included in Volume 10 of the amended applica- <br />tion. Phase II represents a more detailed investigation into potentially cri- <br />tical areas of the site delineated during Phase I of the analysis, including <br />the diversion ditch above the mine facilities, the report of which is con- <br />tained in Volume 10 of the application. The scope of Phase II of the analyses <br />shall include test drilling and excavation of test pits, the installation of <br />appropriate monitoring wells, the performance of various soils and chemical <br />tests, and the performance of a series of stability analyses dealing with the <br />existing facility configurations, proposed reclaimed configurations and with <br />the proposed coal processing waste disposal pile. This analysis shall be com- <br />pleted and a report summarizing the results and methodology thereof submitted <br />to the Regulatory Authority Eor review by December 31, 1981. <br />18. Colorado Westmoreland, Inc. is directed to complete Phase III of the sta- <br />bility analysis and redesign of the final reclaimed configuration of the sur- <br />face facility area of the Orchard Valley Mine, as described in the various <br />Letters of proposal from Merrick fi Company and Geohydro Consultants included <br />in Volume 10 of the amended application. The scope of Phase III shall include <br />the utilization of the findings and recommendations of Phase II to complete <br />specific engineering redesign and amendment of the final reclaimed configura- <br />
The URL can be used to link to this page
Your browser does not support the video tag.