Laserfiche WebLink
<br />-5- <br />_ Location in Application <br />INFORh1ATI0N CATEGORY I NARRATIVE I MAPS <br />2.05.3 Operation Plan: Permit *Uperation Plan - <br />Area 2.05.3 <br />2.05.3(1) Production Methods and <br />Equipment Pending <br />2.05.3(2) Operation Description <br /> Pending <br />2.05.3(3) Mine Facilities <br /> Pending <br />2.05.3(4) Ponds, Impoundments and <br />DiVerSi0n5 See Attached See Attached <br />2.05.3(5) Topsoil (removal and <br />StOrdge) Pending <br />Z.U5.3(6) Overburden <br /> Pending <br />2.05.3(7) Coal Handling Structures <br /> Pending <br />2.05.3(8) Coal Processing Waste and <br />Non-Coal Processing Waste Pending <br />2.05.3(9) Underground Development <br />WdSte Pending <br />2.05.3(10) Return of Coal Processing <br />Waste to Abandoned Pending <br />Workings <br />2.05.4 Reclamation Plan <br /> See Attached <br />2.05.4(2)(a) Timetables <br /> See Attached <br />2.U5.4(2)(b) Reclamation Cost Estimates <br /> $9700.00 <br />2.U5.4(2)(c) Backfilling and Grading *Post-mining <br /> See Attached topography - <br /> 2.05.4(2)(c) <br />2.U5.4(2)(d) Topsoil (Redistribution) <br /> See Attached <br />2.05.4(2)(e) Re vegetation <br /> See Attached <br />