My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11156
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:35 PM
Creation date
11/19/2007 2:17:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Application Correspondence
Doc Date
5/9/1980
Doc Name
ADDITIONS TO APPLICATION FOR RED CANYON #1 MINE FILE #77-232
From
GRAND MESA COAL CO
To
MLR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~_ <br />Coal tom San III IIIIIIIIIIIII III <br />p Y 999 <br />First and Columbia <br />P. O. Box 226 <br />~''~ -n ~ ---- ~, __ i?~ta, Colo. 87 416 <br />May 7, 1980 CSRice: (303) 874 7561 <br />Mine: (303) 856-6402 <br />Marion Dodson Paul f';;Y - J 1"" <br />Reclamation Specialist ~o~ <br />Colorado Mined Land Reclamation FJiii'lE~~ ! ~: ~: ,) pcri ~~,,~ _,~~~,~ <br />423 Centennial Building, 1313 Sherman S <br />~dlo. Dept. e. r~alwei r:esc~.~rces <br />Denver, CO 80203 <br />Dear Marion: <br />SUBJECT: ADDITIONS TO APPLICATION ?OP. RED CANNON dPl MINE, FILE X77-232 <br />Enclosed is the update material for our application to-date. Please <br />include or replace the material as indicated: <br />Replace page C-1 to include new owners of adjacent property. <br />Replace Affected Land Map and Previously Affected Land Map in Exhibit C <br />with new maps. <br />Include cross-sections of yard extension cut and fill with the 3 overlays <br />associated with the yard in a map pocket after page D-126. <br />Replace pages D-14 rs 15 and Diagram 4 with pages D-14-18 and Diagram 4. <br />This includes more information on the load out facility and sediment <br />control installation. <br />Include the three overlays and the cross sections associatec:~~it:~ the <br />sediment pond in a map pocket following page D-18. <br />Replace tables G-3 and G-4 to revise ditch sizing. <br />Include letter from Tim Jones in Exhibit M. <br />Include proof of publication in E:chibit T. <br />Work continues on other deficiencies in our application. C.S.U, will <br />do our soil testing as soon as it dries out enough to take the samples. <br />Water samples will be taken when irrigation run off flows across the place. <br />I have talked with local water officials to get a start on a water aug- <br />mentation plan. I don't expect information on stability of the sediment <br />pond and the refuse pile for a month or two. The geology report ie still <br />4-6 weeks away. As additional information becomes available it will be <br />forwarded to you. If you have any questions please feel free to call. <br />Yours truly, <br />Larry M. Reschke <br />Mine Engineer <br />LMR:ew <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.