My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11117
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:34 PM
Creation date
11/19/2007 2:17:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Application Correspondence
Doc Date
12/27/1996
Doc Name
ADEQUACY REVIEW BOWIE 2 MINE NEW APPLICATION C-96-083
From
DMG
To
JE STOVER & ASSOCIATES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />stover <br /> <br />-2 - <br />NPDES Permit(s) - Response accepted. <br />12/27/96 <br />Permits to Store and Use Explosives - Please be advised that the <br />permittee (BRL) will be responsible for ensuring that compliance <br />occurs for all aspects of any blasting activities conducted during <br />mine development and operation. All permits to store and use <br />explosives must be obtained, and incorporated into this permit <br />application prior to use of explosives at the Bowie No. 2 site. <br />Department of Army 404 Permit(s) - Provide the permits when <br />obtained. We will consider stipulating the submittal of the <br />required 404 permit(s) if the 404 permits are not in place when we <br />are ready to proceed with our approval. <br />2.04.4 - Cultural and Historic resource information <br />8a) Provide a letter from SHPO which verifies the resolution of all <br />remaining SHPO-related concerns. We have incorporated the most <br />recently submitted information as requested in your December 4, <br />1996 letter. <br />2.04.6 - Geologic Describtion <br />10) Previous response pending Pendleton review. <br />2.04.7 - Hvdroloav Description <br />13) Paragraphs 3 and 4 - Responses accepted. Refer to 13vi for <br />discussion regarding possible future stipulations. <br />13a) <br />i-ii) Responses accepted. <br />iii) Response accepted. Please be sure that future Deer Trail <br />Ditch full suite analyses are conducted during the same month for <br />both the upper and lower stations. <br />iv-v) Responses accepted. <br />vi) We will consider your recommendation regarding the need for the <br />referenced stipulation at the time our Findings Document is <br />drafted. The recommendation seems reasonable. <br />vii-xviii) Responses accepted. <br />14a) Response accepted. <br />17 b) Response accepted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.