My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11066
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:32 PM
Creation date
11/19/2007 2:17:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Application Correspondence
Doc Date
8/28/1982
Doc Name
VISITATION TO THE BLUE RIBBON MINE SITE
From
MLR
To
RICH DOMINQUE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiu iii <br />999 <br />STATE OF COLORADO RIC HORD D. LP.MM, fovem o~ <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Executive Director <br />MINED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (3031866-3 56 7 <br />David C. Shelton <br />April 28, 1982 Director <br />TO: Rich Domingue ~\1 ~ _ <br />FROM: Jim Pendleton /~~n .~-~- <br />RE: Visitation th lue Ribbon Mine Site <br />Dave Shelton and I visited the Blue Ribbon mine site on Tuesday, April 13, 1982. <br />We met with Marv Rdams of Western Associates, Inc. and Ken Meyers of Rocky <br />Mountain Geotechnical, Inc. We examined the portal bench and highwall land- <br />slide and rockfall areas. Having closely examined the site, I am now more <br />receptive to the company's contention that the major cause of landsliding of <br />the portal bench is surface water infiltration. Drainage of the mine bench <br />is next to non-existent, causing water to impound and infiltrate in numerous <br />locations. In addition, both sewer and water supply lines appear to have <br />ruptured either slightly before or following the original landslide movement. <br />Both of these situations undoubtedly contributed additional water to the already <br />saturated bench materials. I recommend that we proceed as foll~ot,•s: <br />1) Require Blue Ribbon Coal Company to complete an appropriate surface drainage <br />redesign of the portal bench area. <br />2) Following approval of that design, require installation of the appropriate <br />facilities and regrading of the bench as soon as possible. Obviously, the company <br />will have to work around the large existing coal stockpile now in place on the <br />portal bench. <br />3) Require the company to cease stockpiling coal irmnediately adjacent to the <br />portal bench lip. Coal should be removed from those areas currently threatened <br />by the slide, and should not be placed closer than 10 feet to the bench lip. <br />4) The company should redesign the sewer and water lines serving the portal <br />bench. We discouraged the reinstallation of lines outside the currently disturbed <br />area below surface. we suggested that the company investigate the installation <br />of sewer and water lines above ground in insulated jackets. <br />We also examined the area disturbed by Blue Ribbon Coal Company last fall, to <br />the south of the existing portal area. The company received a Notice of <br />Violation for bulldozing an old access road to an abandoned fan portal. A <br />large portion of the affected slope is now actively landsliding. Head scarps <br />were obvious up to 100 feet above the original road cut. I recormmend that we <br />require that this area be included within the indicated disturbed areas in <br />the permit. Further, I recommend that we require bonding for resolution of <br />this problem prior to reclamation and bond release. <br />/mt <br />cc: Ed Bischoff <br />Dave Shelton <br />
The URL can be used to link to this page
Your browser does not support the video tag.