Laserfiche WebLink
I " ~ <br />I • • <br />7. Annual Reclamation Liability <br />Year Ending <br />Cost Item 1981 1982 1983 1984 1985 1986 <br />Overburden Stock- <br />. pile (BCY) 963,000 723,000 666,000 605,000 400,000 0 <br />Cost to Move @ <br />~ $.40/BCY 385,200 289,200 266,435 242,087 160,000 0 <br />Disturbed Acres 68.7 71.8 69.0 67.9 35.3 0 <br />(ponds, roads, <br />ditches not inch . <br />Cost to Reclaim <br />Distuubed Acres @ <br />$2403jacre 165,086 172,535 165,807 163,164 84,826 0 <br />Ponds, Roads, <br />Ditches and Fencing 22,501 22,501 22,501 22,501 22,501 12,496 <br />TOTAL ANNUAL COST $572,787 $484,236 $454,743 $427,752 $267,327 $12,496 <br />The maximum reclamation liability occurs in 1981 and is <br />' estimated at $572,787. Subsequent years will require decreasing <br />bonds as the overburden stockpile volumes decrease. <br />-17- <br />