My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10945
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10945
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:29 PM
Creation date
11/19/2007 2:16:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Application Correspondence
Doc Date
2/16/1993
Doc Name
HG LOADOUT APPLICATION C-92-081 PAR RESPONSE
From
DMG
To
STEVE WATHEN LARRY ROUTTEN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eabody Holding Company <br />Raos, John G. - Senior Vice President <br />Lee, Robert E.- Vice President <br />Lee, Robert E.- Treasurer <br />Stift, Robert C.- Board of Director <br />Buccarelli, Richard A.- Assistant Secretary <br />Hickey, John J.- Treasurer <br />Peabody Coal Company <br />Koetting, Thomas E.- Vice President <br />Reno, Wayne- Vice President <br />Landuyt, William M.- Board of Directors <br />Grow, G D- Vice president <br />Armstrong, R A- Treasurer <br />3. Section 2.03.4(3)(d) requires the employer identification <br />number (EIN) for each name that owns or controls the applicant. <br />Please submit the appropriate EIN to comply with this regulation. <br />4. In the submitted permit application, Hayden Gulch <br />Terminal stated that the MSHA identification number was pending. <br />Under Section 2.03.4(8) please submit the MSHA identification <br />number to the Division when it has been issued to the HG Loadout <br />mine. <br />Section 2.03.5 Compliance Information <br />510c letters were sent out to other state regulatory agencies <br />who have issued permits and or notices of violation to Peabody Coal <br />Company. <br />Section 2.05.3(3) Mine Facilities <br />Items of concern are addressed in Steve Wathen's review. <br />Section 2.05.3(7)- Coal Handling Structures <br />Peabody is in compliance with rule 2.05.3(7) <br />Section 2.05.4(2)(b)- Reclamation Cost Estimate <br />The Division reviewed Peabody's cost estimate to reclaim the Hayden <br />Gulch Loadout Facility. The Division has the following Concerns <br />Backfillina and Rouah Grading <br />1. Peabody's performance bond estimate basis the operating <br />cost for backfilling and rough grading using dozers on a double <br />shift. For a reclamation project the size of Hayden Gulch <br />Terminal, the Division feels that a single shift is more <br />appropriate. The Division has contacted several contractors <br />regarding shift selection and has been verified that single shifts <br />
The URL can be used to link to this page
Your browser does not support the video tag.