Laserfiche WebLink
eabody Holding Company <br />Raos, John G. - Senior Vice President <br />Lee, Robert E.- Vice President <br />Lee, Robert E.- Treasurer <br />Stift, Robert C.- Board of Director <br />Buccarelli, Richard A.- Assistant Secretary <br />Hickey, John J.- Treasurer <br />Peabody Coal Company <br />Koetting, Thomas E.- Vice President <br />Reno, Wayne- Vice President <br />Landuyt, William M.- Board of Directors <br />Grow, G D- Vice president <br />Armstrong, R A- Treasurer <br />3. Section 2.03.4(3)(d) requires the employer identification <br />number (EIN) for each name that owns or controls the applicant. <br />Please submit the appropriate EIN to comply with this regulation. <br />4. In the submitted permit application, Hayden Gulch <br />Terminal stated that the MSHA identification number was pending. <br />Under Section 2.03.4(8) please submit the MSHA identification <br />number to the Division when it has been issued to the HG Loadout <br />mine. <br />Section 2.03.5 Compliance Information <br />510c letters were sent out to other state regulatory agencies <br />who have issued permits and or notices of violation to Peabody Coal <br />Company. <br />Section 2.05.3(3) Mine Facilities <br />Items of concern are addressed in Steve Wathen's review. <br />Section 2.05.3(7)- Coal Handling Structures <br />Peabody is in compliance with rule 2.05.3(7) <br />Section 2.05.4(2)(b)- Reclamation Cost Estimate <br />The Division reviewed Peabody's cost estimate to reclaim the Hayden <br />Gulch Loadout Facility. The Division has the following Concerns <br />Backfillina and Rouah Grading <br />1. Peabody's performance bond estimate basis the operating <br />cost for backfilling and rough grading using dozers on a double <br />shift. For a reclamation project the size of Hayden Gulch <br />Terminal, the Division feels that a single shift is more <br />appropriate. The Division has contacted several contractors <br />regarding shift selection and has been verified that single shifts <br />