Laserfiche WebLink
• <br />roads ua11 be cor.scructed paralle •o to.os-e~;~ic <br />contours and aligned co traverse natural clear i..-s, <br />etC. Ln Order t0 mLn LiIlLe rL:nOf _' and ui5 Clr~anCe <br />~.DprODriaC2 runoff controls :ai 11 be COnStrL'Cted as <br />needed. Unless it is shover: *_o be tae best alce=- <br />r.ative alignment, no streams cr ::et a_=_s ..il'_ ba <br />tra~rersed. <br />A11 exploration areas cai11 be c%itair. the oe -^it <br />area and :ai l1 be re ,raded and ^.ec; .Dads e:i1i Se <br />bladed. Topsoil that cans re.^..oved prior to <br />constrscticn of drill sites and rotes ~ai1i be re- <br />placed following recontouring. Reve~etation of <br />dri11 sites and new roads wi11 be carried out in <br />accordance :with procedures and seed -i:ctures <br />required by Section 316.111-.117 except that <br />seeding wi11 be by broadcast rattler than drilling. <br />In places where mining wi11 imnediacel;r folloca <br />exploration, dri11 sites ar.d new roads cai11 be <br />mined through and then reclaimed in accordance with <br />the Reclamation Plan set forth under 30 CF3 780 <br />and the relevant subsection of Section 316. <br />Adherence to the proposals and procedures <br />described above wi11 put the apclicant in conpiiance <br />~aich Section 315.15. <br /> <br />D. Revisions to Applicant's ?roposal <br />Vone <br />_. Reanalysis of Compliance <br />:lone <br />.. Stipulations <br />`lone <br />G. Stmmiary of Compliance <br />:Ji11 Comply <br />H. Proposed Departmental Actior. <br />To approve the application as croposed with respect <br />to 30~CFR 815.i5~~ <br /> <br /> <br />