My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10885
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:27 PM
Creation date
11/19/2007 2:14:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Application Correspondence
Doc Date
4/2/1980
Doc Name
RED CANYON #1 MINE FILE #77-232
From
MLR
To
GRAND MESA COAL CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />N <br />Mr. Lav-ry Resckl~e <br />April 2, 1980 <br />-5- <br />N <br />In the present refuse disposal area it is stated that dirt will be <br />pushed up the hill to cover the refuse pile. Does this spoil have any <br />coal slack or contaminants iri it? (717.14(e)) Garments an refuse <br />pile stability, toxicity, and associated water probl®s will follow when <br />reviewed byy tectmical staff ' Some CrO rn m E>>,7 ~, ctr ~ C{ rt a / ~co c f{' r n ~i~2 <br />E?pril 3, (98Q rrinr~.o ~O}n, T'.;, ~~ i:;//~ ~ri-:t , <br />For the drain~e on which the proposed sediment pond dam will be built, <br />a longitudinal profile is needed. This can be taken from contour lines. <br />Cross sections of the stream channel will aid in restoring the channel . <br />at reclamation, and should be taken in any part of the drainage to be <br />disturbed. (2.12 (5)) <br />A plan is needed for disposal of coal slack frcm the proposed dam azid <br />bench area, if spoil fran the dam is to be used to extend the bench. <br />Is this extended bench to be temporary? plain how reclamation will <br />take place. Aarnmt of coal slack is needed, and how it will affect the <br />present calculations far the refuse pile. Records of devth of coal slack <br />should be kept to aid in calculating extent of coal slack over rama;ni a <br />areas. Will there be enough overburden to cover the coal slack? If plans <br />for Phis bench are submitted, adjustments on sediment control must be <br />addressed. Also, any work done in the portal area must be adequately <br />addressed. (717.14 (a)) <br />~~. <br />With excavation of the sediment pond, specify where topsoi will be stock- <br />piled and how it will be stabilized. (717.20 (a)) ~ Py~ ~ ~,n~,,, <br />A better idea of the a[mtimt of coal slack is needed, its depth, and haw <br />much it has affected topsoil. Staff will work with you on this problem. <br />(717.20) <br />Staff has cane up with a suggested seed mix for the Red Canyon ~~1 Mine; <br />(this is subject to change after baseline study): <br />Pounds/Acre <br />Tall Wheatgrass 4 <br />Western Wheatgrass 6 <br />Sodar Streambank Wheatgrass 4 <br />Basin Wildrye 3 ..-. <br />Manchar Smooth Branegrass 1 <br />Sweet Clover .5 <br />Pubescent Wheatgrass 1 <br />Rabbitbrush 2 <br /> 2~5 <br />Sage (A. Tridentata Vasenya) 2 <br /> 2_~_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.