Laserfiche WebLink
r <br /> <br /> <br /> <br />COST TO HAUL & PLACE BUTTRESS MATERIAL OR WASTE SLOPE LAYBACK MATERIAL <br />2 - D8L Dozers $60.00 $120.00 <br />1 - 988B Loader 80.00 80.00 <br />3 Hired Trucks 50.00 150.00 <br />2 Operators 14.00 28.00 <br />Foreman 20.00 20.00 <br />$398.00 <br />10 Min. cycle on trucks <br />12 CY per load <br />50 Minutes per hour efficiency <br />3 Trucks 12 CY <br />Load <br />$398 = <br />$180 / Hour <br />5 Loads = 180 CY <br />Hour Hour <br />$2.21/ cubic yard <br />