Laserfiche WebLink
Memo - Carol <br />Page Three <br />September 10, 1979 <br />-~o its ppeeining location. Ttils topic is difficult to discuss In <br />writing, 1 recommend that we meet with the applicant. <br />6) Sediment Control plan - It Is difficult to assns; the sediment eon- <br />trol plan becai:se it was formulated to comply with the December, 1977 <br />raguiat(ons which were superceeded by the Mey, 1979 regs. The sediment <br />control plan must be redesigned to address the appropriate regulations. <br />The revised sediment control p-an should Include sufficient calcula- <br />tions (using accepted techniques) to show that design requirements are <br />met. In addition, it does not appear that all runoff from the disturbed <br />Brea fla•~s through sediment ponds before leavt.ng the property. <br />