My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10828
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10828
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:21 PM
Creation date
11/19/2007 2:13:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Application Correspondence
Doc Date
2/22/1983
Doc Name
REVIEW OF RESPONSES TO THE PAR FOR THE FOIDEL CREEK MINE PR APPLICATION FN C-056-82
From
MLRD
To
SANDY EMRICH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />The Water Resources Investigation 81-15 (WRI 81-15) wfriclr was used by the <br />applicant does not factor in the existence of the Foidel Creek Mine. The <br />existence of an underground coal mine between Foidel and Fish Creek will <br />radically change the projected impacts. Ground water flow lines will be <br />dramatically altered during mining as ground water flows are drawn into <br />the underground mine workings. <br />Also, the post-mining migration of a ground water pollutant plume from <br />the Foidel Creek Mine workings will not resemble the predictions made in <br />WRI 81-15. The mine working will act as conduits for mine water and <br />spoil water flows. This would have the effect of nroviny the pollutant <br />point source closer to Fish Creek than shown in WRI 81-15. <br />The pollutant plume miyration should be recalculated using site specific <br />data and analyses. <br />The applicant should re-evaluate water consumption within the mine. <br />During the mining operation, it is likely that inflow waters will be <br />consumed within the mine and any excess inflow waters will be discharged <br />to the surface system. The underyround coal mining operation will <br />require water to cool the mining equipment and water for dust <br />suppression. A portion of water within the mine will be consumed within <br />the mine by evaporative loss in ventilcation air, and by increased water <br />adsoroed on the coal leaving the mine. <br />Any use of mine inflow waters will require the applicant to obtain a well <br />permit from the State Engineer's Office. Also, if the inflow waters are <br />determined by the State Engineer to be tributary water, the applicant <br />will have to prepare an auymentation plan. The applicant's present water <br />rights may be sufficient to develop such an augmentation plan. <br />Surface and Ground Water Monitoring (2.05.6(3)(b)) and (4.05.13) <br />Several inadequacies were noted in the review of Exhibit l0a "Hydrologic <br />Monitoring Plan". Rule 4.05.13(2)(a)(iii) requires the quarterly <br />submittal of surface water monitoring report to the Division (C.f~1.L.R.D.) <br />which are to include analytical results from each surface water sample <br />(stream and NPDES) taken during the quarter. The applicant should, <br />therefore, am~nend the monitoring plan to reflect quarterly, not annual, <br />submittal of surface water data. Ground water data should also be <br />submitted on a quarterly basis. Quarterly submittal of monitoring data <br />is consistent with reporting requirements placed on mining permits since <br />February of 1981. <br />The annual mine inflow study should also include a discussion of the <br />source of each inflow (i.e. from fault, fractured roof, abandoned <br />exploration drill hole, weepiny roof, weeping coal face, roof bolt holes, <br />seal to mined out panel area, etc.). <br />
The URL can be used to link to this page
Your browser does not support the video tag.