Laserfiche WebLink
A1'1'ACHML~ 'I 2 <br />~DIMENTATION POND #1 DESIG~ <br />Pit #1 Pond #1 <br />Total Drainage Area = 106 acres <br />Runoff <br />Area I (north drainage, east of <br />diversion ditch) <br />Sediment <br />.1 acre-ft x <br />acre <br />10.6 acre <br />06 acres = <br />Drainage area = 29 acres CN - 84 <br />Channel length = 1600 ft (Avg) 5~ slope <br />Elev = 8275-8200 = 75 ft <br />Tc = .12 hours <br />Peak discharge = 960 csm/in <br />29 cfs/inch runoff (4~ slope mod) <br />29 (.48) = 13.9 cfs @ 10 yr event <br />29 (.75) = 21.8 cfs @ 25 yr event <br />Area II (south drainage area) <br />See Septem <br />correspond <br />Drainage area = 77 acres <br />Channel length = 2500 ft (Avg)\ 4$ (Mod slope) <br />Elev = 8300-8200 - 100 ft // <br />Tc = .18 hours <br />Peak discharge = 840 csm~inch <br />60 cfs/inch runoff <br />60 (.48) = 28.8 cfs @ 10 yr event <br />60 (.75) = 45.0 cfs @ 25 yr event <br />Total peak flow at dam Spillway is: <br />10 yr event: 13.9 + 28.8 = 42.7 cfs <br />25 yr event: 21.8 + 45.0 = 66.8 cfs <br />t <br />19, 1979 MLRB <br />in Appendix Q. <br />Reference: Pr cedures for Deter- <br />mining Peak F ows in Colorado, <br />Soil Conserva ion Service, USDA, <br />March, 1977. <br />Required Pond Capacity 106 acres x .48 <br />Required runoff capacity = 12 = 4.2 acre ft <br />Rquired sediment capacity = 10.6 acre ft <br />Total = 14.6 acre ft <br />Pond will be designed for 15.0 acre ft. <br />Emergency Spillway <br />Peak flow for 25 yr event = 67 cfs <br />From Manning Q = 1n49 AR.67S.5 <br />Using trapezoidal section, earth with vegetation) <br />j-~? ~ A = 10 f t 2 <br />_ ~ ~ WP = 12.47 <br />iT w Si ~ i ~ R = A = 10 <br />e' WP 12.4 <br />n = .03 <br />= 0.80 <br />Q = 1039 (10)(.80).67(.05).5 <br />49.67 (10)(0.86)(0.22) = 94.2 cfs ~ 67 OK <br />