My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10770
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:18 PM
Creation date
11/19/2007 2:13:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Application Correspondence
Doc Date
9/13/1982
Doc Name
FINDINGS OF FACT by MLRB on Stipulations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~; <br />.57n TE of coLOa,,c~ <br />1dIPTD 1/]f1D RLCL~hJATIO;J DORP.D <br />DEPART~~1G11T OF PJATU.2AL RESOURCCS <br />IN THE MATTER OF: <br />COLOWYO COAL h17NE <br />FTi1D7NGS OF F,1CT <br />T0: COLO[JYO COAL COMPiiNk' and aI1 persons presently owning or acluizing <br />now or in ehe future an interest in the Colowyo Coal [-tine. <br />The following findings reflect action taken by the ,fined Land Reclamation <br />Board on August 26, 1982. <br />FIA'DINGSā¢OF FACT <br />Pursuant to the authoriCy vested in the ?fined Land Reclamation Board by <br />C.R.S. I973, 34-33-139, as amended (I 979 .Session Laws, H.G. 1223), the board <br />hereby maF:es the following findings of fact: <br />[rith the imposition of the two stipulations attached, which require <br />continued monitoring of ground water levels and surficial conditions of the <br />Streeter Fill, as recommended by the Division; <br />(1) The experimental practice proposed by Colowyo C'oa1 Company to <br />construct the Streeter Canyon excess spoil fill utilizing alternative <br />configuration and material placement specifications meets all the <br />requirements of Rule 2.06. 2(S)(b) through 2.06.2 (5)(e). lR u1e 2.0G. <br />z (sJ la)1 <br />(2) The experimental practice is based on a clearly defined set of <br />objectives r.'hich can reasonably be expected to be achieved. (Rule <br />(3) The experimental practice has been specifically approved, in <br />writing, by the Director of the United States Office of Surface <br />hli Wing Reclamation and Enforcement as Conti tinned in the Board <br />Decision belao. (Rule 2.06.2(8)(c)j <br />(4) The permit contains conditions which specifically: <br />(a) limit the experimental practice to the construction of the <br />Streeter Canyon Fili, as authorized by the Division and the <br />Director of the Office of Surface t9i.nin9 Reclamation and <br />Enforcement; <br />(b) impose enforceahl.e alternative environmental protection <br />requirements; and <br />(c)' tequi.rc thr pcrmittcc to conduit .~ guar b:cly moniCOr.i.ny, <br />rccorrlinq and t'cporting program. Jl:ulc 2.06.2(11) (d)) <br /> <br /> <br />^'.)!'~~. ('i;~i U. Gri. ill iii tiC ;lrp,i.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.