Laserfiche WebLink
<br /> <br /> <br /> <br />REVIEW RESPONSIBILITIES <br />Colorado Yampa Coal Company - Foidel Creek.Underground Mine <br />2.03.4 Identification of Interests Susan <br />2.03.5 Compliance Information Sandy <br />2.03.6 Right of Entry Susan <br />2.03.7 Unsuitability ~ " <br />2.03.8 Permit Term " <br />2.03.9 Insurance " <br />2.03.10 Other Permits <br />2.03.11 Identification Public Office <br />2.03.12 Proof of Publication <br />2.04,3 Site Description and Land Use Susan <br />2J 04.4 Cultural/Historic ~ Susan/SBPO <br />/ <br />"2.04.5 General Hydro. /GeoZ . Technology - • J• r,- <br />r ~ ) <br />, <br /> ' <br />~ <br />r <br />2.09.6 Geology '-~'"~`-- 1 <br />2.04.7 Hydrology <br /> Ground Water ;' '~~~'%'--~ <br />1 Surface Water ~'~'~'~' <br />2.04.8 Climate Sandy <br />2.04,9 Soils " <br />2.04,10 Vegetation <br />2.04.11 Fish and Wildlife <br />2.04.12 Prime Farmland " <br />2.05.2 Op. Plan - Life-of-Mine Susan <br />2.05.3 Op. Plan - Permit Urea Susan <br /> Facilities Susan ' <br /> Roads Susan <br /> Pon c7s, Impounr7men ts, Diversions Bob <br /> Topsoil Susan <br /> Overburden 7~rw~. <br /> Coal Handling Susan <br /> U/G Development Naste Jim P, <br />