Laserfiche WebLink
• iii iiiiiiiiiiiii iii <br />S rarE or- r_or OR4go eir r~nen n. i ., •.nn. r.„~,.~„~„ <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Executive Director <br />M1NED LAND RECLAMATION <br />423 Centennial Building. 1313 Sherman Street <br />Denver, Colorado 80203 Tel.(30$) 866-3567 <br />September 9, 1982 <br />TO: Foi del Creek Review Team <br />FROM: Sandy <br />RE: Review Strategy <br />Objectives <br />David C. Shelton <br />Director <br />Colorado Yampa Coal Company (CYCC) has submitted an application for an underground <br />coal mine, the Foi del Creek Dfine. This mine will face up in an old strip pit <br />and CYCC will utilize the existing facilities at their Eckman Park surface <br />mines, Permit No. 79-177. The Foi del Creek application will reference Permit <br />79-177 in several sections. A copy•of Permit 79-I77 is available in my office. <br />Please leave a note if you've borrowed this copy from my office. <br />CYCC would like to combine the Foi del CreeY. hii ne and the surface operations <br />at Eckman Park, Permit No. 79-177, into one permit. She Eckman Park application <br />was approved in March, 1980, for a 5-year permit term. Rule 2.08.3(1) <br />prescribes a mid-term, or 2'd-year, permit review, which trill be in September. <br />Therefore, during the Foi del Creek application review, any deficiencies noted <br />in the Eckman Park application should be carefully noted: regulation, deficiency, <br />and what is needed to bring the permit into compliance. This should then be <br />given to me. <br />She Foi del Creek review will follow the statutory deadlines of 20 days For <br />completeness, 60 days for preliminary findings, and I20 days fora written <br />decision. To meet the ti me frames, cre will need to follow the schedules set <br />forth below for completeness and the preliminary findings (Adequacy Review). <br />Review Responsibilities <br />Review assignments for each section is attached, as well as a checklist for each <br />section. PZease use this checklist during the entire review. I'll keep a <br />master copy in my office. Each re vieJ,~er will be responsible. for the completeness <br />and adequacy review. <br />we will be meeting regularly during the review process. At that time, we will <br />discuss progress and problems. <br />