Laserfiche WebLink
:~ <br />07-29-1996 03~05PM FROM E. STOVER & ASSOCIATES TO DM: P.03 <br />F11X T&]1N8lQTT11L <br />David Berry Page 3 July 29, 1996 <br />DMG recommended ephemeral drainages be monitored for field and <br />full suite parameters. The reca®ended sample frequency was <br />followed during the 1995 baseline monitoring period (ref. page <br />2.04-34). No flow was noted in the four ephemeral drainages <br />located within the permit area between Steven Draw and Hubbard <br />Creek during 1995. The monitoring frequency presented on page <br />2.05-72 is for the poet operation phase of the project, not <br />the baseline monitoring phase. <br />/9. The DMG indicates that in my letter to the DMG dated April 11, <br />1995, concerning the April 7, 1995 meeting with the DMG, the <br />DMG recommended there be monthly monitoring of field <br />parameters and sampling full suite parameters three times <br />during the irrigation season of the Deer Trail Ditch. The <br />reca®ended sample frequency was followed during the 1995 <br />baseline monitoring period (ref. Volume III, Exhibit 3-. The <br />monitoring frequency presented on page 2.05-72 is for the poet <br />operation phase of the project, not the ba^e11ne monitoring <br />phase. <br />10. The DMG indicates that in my letter to the DMG dated April 11, <br />1995, concerning the April 7, 1995 meetlnq with the DMG, the <br />DMG recommended three alluvial wells be drilled at the <br />proposed truck loadout area. The wells were not drilled <br />because of budget constraints. 8RL plane to construct the <br />wells in the near future. <br />TOTRL P.03 <br />