Laserfiche WebLink
<br />/: <br /> <br />• <br />• <br />-2- <br />possible problems due to future precipitation events. The construction <br />of the temporary bridge, .conveyor bent construction, and removal of the <br />bridge is anticipated to take.no-more than two weeks, and is_scheduled <br />to begin no later than April 17, 1981, providing, of course, that <br />materials to be used in the construction arrive on schedule. <br />lde respectfully submit this document and two (2) attached drawings for <br />a minor permit revision to expedite the construction of the conveyor <br />bent. If you have any questions, call me at 963-3440. <br />Sincerely yours, <br />Goa ~~ <br />Craig A. Sherwood <br />Environmental Coordinator <br />CAS/dl <br />Enclosures 2 <br />