My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10708
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:27:04 PM
Creation date
11/19/2007 2:13:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992079
IBM Index Class Name
Application Correspondence
Doc Date
12/15/1992
Doc Name
COMPLETENESS COAL GULCH APPLICATION C-92-079
From
DMG
To
HARRY RANNEY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• !~ iii iiii uiu iii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Natural Resources <br />1313 Sherman SI., Room 215 <br />Denver, CO 80203 <br />Phone: (3031866-3567 <br />FA%:13031832-8106 <br />DATE: December 15, 1992 <br />TO: Harry Ranney <br />FROM: Cathy Begej (-1 tN~ <br />RE: Completeness, Coal Gulch Application C-92-079 <br />Greg Lewicki came in to walk me through his latest December 14, 1992 submittal. I <br />expressed the following concern to him when he was in the office. <br />-Double completion well- <br />• Needs a sand filter pack around the casing through out length; <br />• Packer should have bentonite and thickness should be specified; <br />• Steel casing may corrode in Menefee necessitating additional work; <br />Inconsistency in proposed monitoring plan- <br />• Coal Gulch well should have quarterly analysis; <br />oF' Oro <br />~-' R <br />R= <br />~~ b <br />.•~~~ o <br />Roy Rnmer <br />Governor <br />Michael B. Long <br />Drv~sion Director <br />-Location of 92-2. I would like to see it on a minor synclinal structure in the area <br />rather than an anticlinar structure. Actually, if there is any drawdown, it will be <br />exacerbated in that well, so I can live with the location. <br />-Will have to file for a drilling permit and post a bond. <br />After he left the office, I read the memo more closely and had the following additional <br />concerns. <br />-The last paragraph suggests that they want a completion assessment out of this <br />submittal. I envisioned this letter as a progress report. Review of the October 20 <br />letter suggests that completeness is dependent on the availability of some aquifer <br />physical test information. I think we're looking at a March 20, 1993 completion <br />date at the earliest, if they finish drilling and pump tests by February 20, 1993. <br />-The Messier Well should have field parameters taken monthly too. <br />CWB/yjb <br />m:\oss\yjb\coalgulch <br />
The URL can be used to link to this page
Your browser does not support the video tag.