My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10693
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:27:03 PM
Creation date
11/19/2007 2:12:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X199621900
IBM Index Class Name
Application Correspondence
Doc Name
Modified NOI Application
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' casing that will be cemented in place, prior to beginning the <br />hole. This practice will allow for the drill hole, in the <br />unlikely event necessary, to be shut off at any time. The above <br />described plans will assure that all encountered ground water <br />will be contained within the confines of the drill pad. <br />Well Completion <br />' Several of these exploration holes may be converted to hydrologic <br />monitoring wells. In the event a monitoring well is completed at <br />a site, the well completion report will be forwarded to the <br />appropriate agencies. It is anticipated that wells will be <br />constructed with 20 slot screen and 8/12 silica sand or a pre- <br />packed, stainless steel well screen. A bentonitic plug will be <br />placed above and below the screened interval to prohibit vertical <br />' migration and cross contamination of aquifers. Figure 2, Typical <br />Monitor Well Completion, illustrates the typical completion <br />method. Once the well is no longer required, it will be grouted <br />from the bottom to top with a cement grout. The casing will be <br />cut off two to three feet below the ground surface, and the <br />surrounding soil will be used to backfill the void left by the <br />' removal of the casing, <br />Reclamation <br />' The reclamation of the sites will typically progress shortly <br />after completion of each hole. Reclamation will consist of drill <br />' hole abandonment, filling in of mud pits, regrading as needed, <br />topsoil re-distribution, and seeding. All reclamation activities <br />will be completed by the end of each fall drilling season, unless <br />weather conditions prohibit. If this occurs, the reclamation <br />work will be completed the following spring when ground <br />conditions permit. In any case, all reclamation activities will <br />be completed by the end of June, 1998. Sediment control measures <br />' for the drill pads and topsoil stockpiles will remain in place <br />until reclamation of site is completed. <br />' For sites constructed on cropland, the seeding mixture and <br />process will be developed in consultation with the appropriate <br />landowner. For pastureland areas, sites will be reclaimed using <br />the following seed mixture totaling 17.0 PLS lbs per acre: <br />' Smooth Brome (7.0 PLS lbs/acre), Intermediate Wheatgrass (6.0), <br />Crested Wheatgrass (3,0), Alfalfa {1.0). <br />' Drill Hole Abandonment <br />Drill holes which are not converted to monitor wells will be <br />abandoned as illustrated in Figure 3, Drill hole plugging method. <br />Drill hole abandonment will be conducted in accordance with Rule <br />4.07. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.