Laserfiche WebLink
.~.-. .~~ <br />i~ <br />1. Energy Fuels submit the required nwnber of corrected copies of the <br />permit application within 60 days. <br />2. Energy Fuels will review the currant pPSmit and remove a.11 <br />reference to the use of the hydro-axe to produce a wood chip <br />mulch. The correction should take place w-itrin a period. of <br />sixty days. <br />3. Representatives fran Energy Fuels Corooration, Colorado Division <br />of Wildlife, Mined Land Reclamation Division, and Office of <br />Surface Mining will meet at the site during the spring of <br />1980 to discuss the impacts of mining on the sage grouse lek <br />identified in the permit. A joint agreement will be arrived <br />at to mitigate my negative i*rpacts on the lek as a result of <br />EFC's mining activities. These mitigative measures will becane <br />part of E'rg's permit. <br />4. Energy Fuels Corporation incorporate all conditions frun previous <br />permits on mine 1 and 2 into permit ~f79-177. <br />5. Energy Fuels Corporation will work with the Departrnent of the <br />Interior to resolve any ranaining archaeological concerns generated <br />by EFC's mining of the area, and will make any necessary changes <br />to the approved mining and reclamation plan. <br />6. Energy Fuels Cci-poration will submit a reclamation plan for the <br />C16284 area after the site is inspected by Mined Land Reclamation <br />Division representatives. <br />7. Energy Fuels Corporation will comply with the Division of Water <br />Reso~sces rules and regulations. <br />8. Energy Fuels Corporation adhere to the reclamation schedule <br />defined in the letter of March 24, 1980 fran Nu'. Gerald Graudy <br />to Mr. Hamlet J. Barry, III. <br />s <br />