My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10663
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:27:01 PM
Creation date
11/19/2007 2:12:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Application Correspondence
Doc Date
11/5/1984
Doc Name
YOUR LETTER DATED 10/25/84 EASTSIDE MINE PERMIT REVIEW FN C-84-063
From
EASTSIDE COAL CO INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The sediment control for the office area will con- <br /> sist of diversion ditches, DD-2 and DD-3, to divert up- <br />slope drainage around the site and revegetation, mulch- <br />ing or gravel surfacing of any other disturbed area. <br />Drainage from the disturbed surface area will be con- <br />trolled.by straw bale dikes in the drainages during the <br />construction period. <br />After the construction is completed, the areas not <br />needed for parking and supply storage will be seeded <br />and mulched. The areas used for parking and supply <br />storage will be graveled. <br />The construction of the office building site will <br />consist of removal of any soil with the potential of <br />• supporting growth. This soil will be obtained from the <br />area to the west of the existing road to the minesite. <br />Approximately 24 inches will be salvaged. The area will <br />then be graded to meet the topography as shown in the <br />Postmining Contours, Drawing 6. Road relocation will <br />occur at the same time the grading occurs. The office, <br />shop and bathhouse facilities will then be constructed. <br />The soil material that had been salvaged will then be <br />respread over any of the areas not necessary for parking <br />or supply storage. Seeding and mulching will occur im- <br />mediately after the completion of the regrading opera- <br />tion. Any areas not seeded and mulched will be gravel- <br />ed to provide an erosion resistant surface. <br />• During construction of the office and shop facili- <br /> <br />94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.