Laserfiche WebLink
• 3.900 cubic yards of soil will be required to co- <br />ver the 4.9 acre surface facilities area with a minimum <br />thickness of six inches. There is 3,300 cubic yards ex- <br />cess soil from the waste disposal site. The regrading <br />of the surface facilities area will result in an excess <br />of 600 yards of material. This 600 yards along with the <br />3.300 yards excess from the waste disposal site will be , <br />used to cover the surface facilities area with a minimum , <br />of six inches of soil. , <br />The office site will have two feet of material.re- <br />moved, but this material will be used in the reclamation <br />of the office site. No excess material will be genera- <br />ted here during the reclamation activities. Only ap- <br />proximately one-half the office area has soil which may <br />be salvaged. Therefore the soil that is salvaged in <br />the office area will be used to cover the reclaimed site <br />with a minimum of 8 inches of soil. <br /> <br /> <br />lOlA , <br />