Laserfiche WebLink
• ties site, a fabric filter dam will be installed along <br />the top of the fill in the low areas. The higher areas <br />will be ditched so as to divert all the runoff from the <br />outslope of the fill. This will ensure all drainage dur- <br />ing the construction period will pass through the fil- <br />ters prior to going into the natural drainage. After <br />construction is completed, the outslope will be vegeta- <br />ted. The fabric filter. dams will be maintained until <br />the outslope area has sufficient vegetation to control <br />erosion. <br />The drainage pattern of the office site will be to <br />the south parallel with the access road. A series of <br />two fabric dams will be placed along the southern edge <br />• of the site. This will ensure all discharges occurring <br />from the area will pass through the filters prior to go- <br />ing into the natural drainage by way of Diversion Ditch <br />DD-2. This along with the revegetation and gravel sur- <br />facing will control the transportation of sediment off <br />the site. <br />The seed mixture to be used in the office area is <br />listed in the Revegetation Seed Mix, Table 3, Page 76. <br />Lawn grass and shrubs may be planted around the office <br />buildings. <br />• <br />95 <br />