Laserfiche WebLink
,.. <br />Mr. Scott Patten <br />April 5, 1982 <br />Page -5- <br />E. Clarification of topsoil replacement thicknesses. <br />F. Clarification of autumn planting of wheat or oats on <br />permanently reclaimed surfaces. <br />G. Maximum spEeds on haul roads as delineated in t!~e B:.ri right-cf-r:ay <br />lease are 20 P1PH, haul roads s;:eeds are des.:gra ted as 30 I1P8, <br />in the permit application. <br />H. Topsoil stocY.piles along the BLM right-of-way rjp not exist. Ail <br />topsoil materials were stocJ:piled on site. <br />Flatiron and the Division wish to con -lude the permitting process as soon as <br />possible. To this end Flatiron,has committed to subrrzitting t.9e above int~orrr~ation <br />by April 30, 1932. The Division is erol-osing to issue a decision pac):age <br />at the end of hfay 1982. <br />If you have any questions or comments please Feel free to call. <br />Sincerely, <br /> <br />Michael S. Savage <br />Reclamation Specialist <br />h]SS: ys <br />