Laserfiche WebLink
. From: W Iliam P. Belaz To: Dave Harty Date: pI51p5 Time: 12:16:01 Pape 2 of 9 <br />Ba1az & Associates, Inc. <br />203 Sunset Circle Palisade. Colorado 81526 (970) 464-7942 <br />September 5, 1995 <br />Ms. Christine Johnston <br />Mr. Dave Berry <br />Division of Mutes and Geology <br />Department of Natural Resources <br />1313 Sherntatt St., Room 215 <br />Denver, Colorado 80203 <br />Re: Cost Proposal-OC #2 Mute <br />Dear Christhte and Dave: <br />Please fmd attached the cost proposal and project schedule to develop the reclamation plan for the <br />OC #2 Mine. Man-hours have been redistributed from follow up htto the CARD portions of Tasks <br />1 3 attd 4. Man-hours have been added itt the field survey portion and to assetttble the Teclutical <br />Revision package. The field survey is assumed to be done in one long day by two tnett rather than <br />having a professional engineer and a two tttart survey crew. By working Otte long day, the cost of <br />motels aze eliminated. It has been asstuued that the sedimentation pond will have to be surveyed to <br />update the existing site topographic ,trap. Sufficient poutts will be obtained to generate a new' site <br />topographic map based on relative elevations. Soil samples will be collected in the disturbed area <br />to provide data on the slope stability analysis for the regrading plan and post minhtg topography <br />development. If no surveying is needed in the field, tltett the matt-hours required in the field <br />should be lower. The redistribution of matt-hours from the follow up phase appears reasonable as <br />Balaz R Associates and KLH intend on reviewing aspects of the project with the operator attd <br />Division as questions arise. By working together, the time for follow up should be lower. <br />The cost proposal does not include allowances for htsurattce yet as we aze finalizhtg the costs. We <br />anticipate having the certificates and costs by Wednesday, September 6, 1995. Prices quoted in <br />the attached schedule aze valid for 30 days. If purchase order and authorization to proceed are not <br />received witltitt 30 days, the cost proposal is subject to cltutge without notice. Changes to the <br />scope of work will require review of the project budget to see if a cost adjustment is required. <br />The project schedule has the Teclutical Revision beutg cotttpleted by September 30, 199 <br />assuming that the project starts on September 11, 1995. If the project start date is delayed more <br />