My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10471
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10471
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:51 PM
Creation date
11/19/2007 2:10:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Application Correspondence
Doc Date
9/21/1984
From
RYAN INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ge 2 <br />September 21, 1984 <br />Mr. Dan Afa[hews, Dept. Natural Resources <br />7. We feel no backfill of the Pit 4 haul road needs to be anticipated. <br />The yardage you assumed is greater than the entire yardage used to <br />construct the road. <br />8. lr'o cos[ needs to be anticipated for the removal of the metal building <br />and associated area clean-up. We feel that in the worst case the <br />cost of this work would be that the building would be given to the <br />demolition contractor for the work performed. In reality, we would <br />expect that there would be positive salvage value from the demoli- <br />tion of the building. <br />9. We would generally agree with the assumptions regarding the reclama- <br />tion of sediment poinds at pits 2 and 3, however, we still feel the <br />hourly costs are excessive. Using the more realistic Caterpillar <br />costs, we would arrive at $9,670.00 for this work. <br />10. We would not expect any reduction of main haul road width would be <br />necessary. <br />Our summary of the various anticipated costs would then be: <br />Pit 4 Reclamation $162,478.00 <br />9,345.00 <br />Pit 6 Reclamation -0- <br />Pit 1, 2, 3, and 5 Reclamation 9,430.C0 <br />Shop removal -0- <br />Sediment Pond 2 and 3 Reclamation 9,670.00 <br />Haul Road Reclamation -0- <br />Main Road Reclamation -0- <br />$190,923.00 <br />We would suggest that the above would more accurately represent the amount <br />which should be required to be bonded. <br />lde look forward to discussing this with you in more detail. <br />Sincerely <br />TED/dp <br />Thomas E. Dapp <br />Western Division Tlanager <br />Ryan Inc rporated o Wisconsin <br />RYAN INCORPORATED OF WISCONSIN 3100 E. 56TH STREET, INDIANAPOLIS. IN 46220 (317)257-5433 <br /> <br />. -< -~1: <br />
The URL can be used to link to this page
Your browser does not support the video tag.