Laserfiche WebLink
1 •a. <br />TRINIDAD BASIN MINING, INC. <br />P. O. BOX 783 <br />TR<1VIDAD, COLORADO 81082 <br />Telephone (303) 896 -2.900 <br /> <br />J I' ~ ~ 1982 <br />June 2, 1982 <br />Mr. I•iichael Savage <br />Alined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Mike: <br />MINED LA(\~D Fi.C! Ai~4r^,TIUV <br />0010. Dea?. O1 i~'atu r~l Rnsl~nr~or <br />Trinidad Basin i~fining would like to extend the compliance <br />deadline of June 1 to June 15 pertaining to the placing of rip <br />rap in the spillways of Ponds 22P3 and 22P4. <br />.Je would also like the same extension date for removal <br />of sediment from Pond 22P4. We have not been able to comply <br />with the present dates due to heavy rains during the month <br />of Aiay. <br />Thank you for your cooperation and we look forward to <br />working with you in the future. <br />Sincerely, <br />Bruce Baker <br />Mine Foreman <br />mb <br />