My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10395
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:47 PM
Creation date
11/19/2007 2:10:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Application Correspondence
Doc Date
12/5/1996
Doc Name
BOWIE 2 MINE NEW APPLICATION C-96-083
From
JE STOVER & ASSOCIATES
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. A. Henry - 4 - December 4, 1996 <br />v) DMG -Response accepted Ha-~e the wells been installed? If not, provide a <br />specific well installation schedule. <br />BRL -The wells have been completed. Enclosed are completion drawings for the <br />alluvial wells. These diagrams show specific data for each hole and will replace the <br />drawing titled Alluvial Wells -Typical Completion Diagram. The completion <br />diagrams are to be inserted into Volume III, Exhibit 3. <br />vi) DMG -Response accepted A stipulation will be attached to arty future approval <br />which specifies that additional hydrologic baseline monitoring and hydrologic <br />analyses will be required if B-Seam mining is proposed by BRL. <br />BRL - No response required. However, since a permit revision will be required to <br />mine the B-Seam, is the stipulation which requires additional baseline monitoring <br />to mine the B-Seam actually required? Such a stipulation will be attached to the <br />permit for many years and be a continual nuisance for both the DMG and BItL. <br />vii) DMG -Response accepted. BRL - No response required. <br />viii) DMG -Response accepted Monitoring of the zone above the B-Seam may be <br />required with airy proposal to mine B-Seam Coal. <br />B1tL - No response required. <br />ix - xi) DMG -Response accepted. B1tL - No response required. <br />xii) DMG -Please address the possibility that these wells might be rehabilitated. <br />BRL -Drill holes 13 and 38 are both completed in the upper D-Seam. There is a <br />road to DH-13 however, a section of the road to DH-38 was taken out by a side a <br />few years ago. BRL will agree to rehabilitate DH-13 during the summer of 1997. <br />Since road construction through an unstable area is requued to rehabilitate DH-38, <br />BRL is not inclined to commit to the rehabilitation DH-38. <br />xiii) DMG -Response accepted. B1tL - No response requved. <br />xiv) DMG -response accepted. BRL - No response required. <br />xv) DMG -Please provide additional Steven Draw data to complete the 1996 flaw <br />season. <br />BRL -Additional Stevens Draw flow data is epclosed. <br />xvi) DMG -Response accepted. B1tL - No response requved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.