My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10393
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:47 PM
Creation date
11/19/2007 2:10:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Application Correspondence
Doc Date
5/14/1980
Doc Name
TR TO PERMIT 76-16 PIT 3
From
ENERGY FUELS CORP
To
MLR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />'+ ~ Richard A. Mills <br />May 8, 1980 <br />Page 3 <br />7. Additional acreage south of the tipple (1.5 acres) is requested to <br />be included in the permit, to provide an area for a sedimentation <br />pond. Also, 5.0 acres are requested to be added to the permit to <br />contain two sedimentation ponds on the northwest side of county <br />road no. 49 northeast of the Pit 3A area. The trade for this <br />acreage is also from the 40 acres in Section 24. Energy Fuels <br />Corporation owns all surface in those areas in this item, and in <br />No. 6, as per the previous permit. <br />Two additional parcels are requested to be added to the Permit to <br />accommodate road alignments, which for reasons relating to acces- <br />sibility, are outside existing boundaries. These parcels are <br />located in the SEA of the SW~y of the SE's of Section 13, Township SN, <br />Range 86W, and in the SW~ of the SW's of the SE's of Section 12, <br />Township SN, Range 86W. The addition of these parcels, plus the <br />other additions, totals somewhat less than the 40 acres withdrawn <br />from the Permit in Section 24. <br />8. The two temporary overburden storage areas in Section 12, TSN, <br />R86W, will be graded during the summer of 1980, as previously <br />permitted. <br />9. The shop and parking location for Pit 3, originally proposed to be <br />located southeast of Tipple 3, is located as shown on Map 1, for <br />reasons relating to the desire and practicality of being proximate <br />to the mine activities. <br />It is proposed that these facilities be left for the use of the <br />Middle Creek Mine, to be reclaimed at the conclusion of those <br />activities. <br />10. The permanent overburden pile in Section 24 previously permitted <br />contains not three million cubic yards as permitted, but only <br />1,079,730 cubic yards (on 16.5 acres) with an additional 181,000 <br />cubic yards (on 8.3 acres) in the road to that pile. This pile <br />will be graded to the approximate original contour during the <br />spring of 1981, with soil replacement to occur in the summer of <br />1981, and seeding in the fall of 1981. <br />11. Bonding: <br />Pit 3 and Middle Creek Mine activities as permitted are bonded at <br />$200,000 within the following parameters: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.