Laserfiche WebLink
<br /> <br />• wells as a part of the operational hydrologic monitoring plan <br />for the Yoast Mine. SCC has revised Table 15-8 to include <br />both the Trout Creek Sandstone production well (YTC32) and <br />Trout Creek Sandstone observation well (YTC33), and to <br />identify the frequencies proposed for monitoring at both <br />wells. Table 15-3 has also been modified to include these two <br />proposed wells. <br />Monitoring of these wells is contingent upon BCC's decision <br />whether to construct the mine facilities as proposed in the <br />Yoast PAP. If SCC decides not to construct the mine <br />facilities, SCC commits to performing an evaluation of the <br />potential for mining impacts to the Trout Creek Sandstone in <br />order to justify not monitoring this aquifer. This evaluation <br />will then be submitted to the CDMG in the form of a technical <br />revision. <br />50. SCC has not proposed discontinuing monitoring of the Wolf <br />Creek Underburden Well YWCU31 in Tab 15, either on Page 21 or <br />in Table 15-8. This issue was clarified during the February <br />1, 1995 meeting held in Denver between SCC and CDMG personnel. <br />Review of Table 15-8 has resulted in SCC modifying the table <br />to show monitoring frequencies for water quality at Wolf Creek <br />Coal Well YWC31. <br />Tab 16 - Protection of the Hvdrolovic Balance <br />• 51. SCC has initiated the process of securing the water rights <br />necessary for using water from sedimentation ponds (010 and <br />012) for dust suppression. The process includes submitting <br />the recently completed report titled "Water Rights <br />Investigation and Plan for Augmentation for the Yoast Mine" <br />(the Plan) to the District Court for Water District 57. The <br />submittal will trigger BCC's application for water rights at <br />both sedimentation ponds via transfer of existing SCC water <br />rights in the Sage Creek Basin. Three copies of the Plan are <br />included with this response for insertion in Attachment 16-1, <br />Tab 16, Volume VIII of the Yoast PAP. <br />52. Three copies of the "Water Rights Investigation and Plan for <br />Augmentation for the Yoast Mine" are included with this <br />response package for inserting into Attachment 16-1, Tab 16, <br />Volume VIII of the Yoast PAP. <br />,~ 53. This question has not yet been addressed. <br />Tab 17 - Probable Hvdroloaic Consequences <br />54. As each pit is being excavated, the previous pit is being <br />backfilled with the spoil being excavated. A review of Tables <br />• 17-2 through 17-5 shows that after the first year each pit is <br />only open for an average time of 107 days. Spoil springs do <br />13 <br />