Laserfiche WebLink
• Response <br />Geoehemical characterization of Lorencito coal has been provided. Picketwire ProcessinU <br />will submit a technical revision to the New Elk Vtine permit to allow for this material to be <br />processed at the site and associated refuse material to be disposed of in the RD.~. a <br />stipulation to the Lorencito pemti[ for this issue will be acceptable. <br />Rule 2.05.4 Reclamation Plan <br />~~ 103. Final resohnion of this issue ~~ill be during the stipulation resolution with re_ard to the <br />6~ engineering work to be conducted for the fills. Therefore, this response is presently <br />S,jl~~ inadequate. <br />/ Response <br />Final design of the till areas of the surface mine will be submitted following geotechnical <br />studies proposed for the area after [he pemtit has been issued. LCC requests a stipulation for <br />this information. <br />110=1. Lorencito Coal Company revised page 2.0~-~9 in response to DMG's questions No. I04 and <br />b~ ~`~ 10?. ~h"hile Lorencito Coal Compam's response was suitable, some tomcatting problems <br />• ensued with page _.Od-~9. Paragraphs I and 2 were duplicated on page 2.0~-~9. With <br />elimination of the duplicated paragraphs. the Division will accept this revised page. <br />Response <br />Paces 2.0~-~9 and_.0~-~9a have been revised to eliminate the duplicated paraeraphs. <br />Y' 10'i'. Fiuure 2.04.4-20 teas not included with the revised materials. <br />r `r ` <br />Response <br />Figure 2.0?.4 ?0..as included in the original submittal as paee?.Od-7~B ;md has been in the <br />document since December 1996. Please reference this figure for the information requested. <br />Rule 2.05.5 Post iViining Land Lase <br />The response to question 109 is adequate. The application is incompliance with Rule ? 0~.:. <br />Rule 2.05.6(1) ,air Pollution Control Plan <br />110. The applicants response is adequate. However. if the Division does not receive a cope of <br />1~ an initially approved emission pemtit (or other equivalent form of permit) by the tinx the <br />\Q mine application is ready for approval, the Division will have to stipulate receipt of the <br />emission permit prior to the operations be,inning to which the emission permit applies. <br />is <br />