My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10291
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:41 PM
Creation date
11/19/2007 2:09:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Application Correspondence
Doc Name
LORENCITO CANYON MINE PERMIT REVSION EXHIBIT 8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• investigation. It is attached for :our re+ie++ and :omnteia. Therefore. LCC reyuests that a <br />stioula[io^ be placed on the perntt to regwre this im~~rmation prior to surface disturbance. <br />Sb. The applicant's response to this question is inadequate. Visual estimation of sediment levels <br />~~ ~ ` in ponds durin_ quarterly inspection ++ould be acceptable. but onh~ if a commitment to <br />establish meaningful markers allo++in~_ a some~~hat quantitative estimate is incorporated into <br />the permit [ext. Please add to the test on page_.0~-33 discussion of use of markers or <br />similar devices to estimate pond sediment levels. <br />Response <br />A commitment to install staff Jades in the ponds may be found on page 3.0~-33. <br />Rule 2.05.3(51 Operation Plan -Topsoil <br />Under this section, all responses were found adequate except as listed below. <br />90. <br />• <br />Overburden sampling results in Exhibit (i. Several samples indicate that coarse fra~men[s <br />could be problematic in some of the overburden. Careful placement of o+erburden ++ith <br />limited coarse fragments +cil! need to be fo!]o+ved +chen using alternate plant ero++th <br />medium. <br />Rule -4.06.1(3) requires that topsoil be redistributed in accordance ++ith Rule -4.06.=4. Should <br />excess soils remain along permanent road++a}. Rail load out, etc.. the excess soil +vill need <br />to be utilized at locations identified as deficit topsoil. <br />Response <br />The response to this comment will be ans.vered in a future submittal. <br />Rule 2.05.3(61 Operation Plan -Overburden <br />Under this section, all responses were found adequate except as listed below. <br />~l. The applicant has indicated the response to this question is forthcoming. The applicants <br />~~~~ response is therefore inadequate at this time. <br />C~ <br />S~1Q Response <br />Information requested in this comment will be collected during the ~eotecltnieal <br />investigations follo++ing pemtit issuance. CTL/Thontpson has provided a methodolo~~+ for <br />the geotechnical till im estigation. It is attached for your review and comment. LCC requests <br />the Division stipulate the collection and submittal of the information. <br />• <br />l~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.