Laserfiche WebLink
<br />b. Culverts YB-4, 5, and 6 have been enlarged due to the revised <br />routing used in the mining area. <br />44. The runoff from the two drainages local:ed between Culverts YA- <br />3 and YA-4 will be diverted away from the road fill. Riprap <br />will be placed at the base of both fill area slopes to divert <br />the water to Culvert YA-3. These two drainage areas were <br />included in the SEDCAD+ calculations for the sizing of Culvert <br />YA-3, which will handle any flows from these drainages. <br />45. SCC has included in the narrative, a description of the <br />intersection occurring between a "dirt: road" and the proposed <br />Road A at Station 74+25. This "dirt road" and others are <br />similar to the County roads in the area. Approaches similar <br />to those alornl the tie-across haul road will be constructed on <br />the fill slopes of Road A and stop :signs will be placed on <br />both sides of the haul road. Access will be maintained for <br />those people who utilize the "dirt road". <br />46. Exhibit 13-10.6 has been revised so that it does coincide with <br />Exhibit 13-11.1. One error was that the elevations were <br />incorrect on the profile portion of the map. You should now <br />be able to match up the profile of Exhibit 13-10.6 with both <br />Exhibit 13-10.5 and 13-11.1. Also, the end of Road A on the <br />profile was riot located properly. It has been moved to the <br />correct location. Station 161+03.17 on Exhibit 13-10.6 should • <br />be matched with Station 0+00 on Exhibit 13-11.1. <br />47. The landslide/mud flow area as depicted by CDMG, has not been <br />field verified at this time and, therefore, the stability <br />question cannot be assessed. In the interest of permit <br />submittal, the monitoring road has been removed from the map. <br />Mining is not: being requested in the area of the CDMG noted <br />slide location and, therefore, should not present any <br />problems. <br />48. Northwest Colorado Consultants (NWCC) were retained to conduct <br />a geotechnic~il investigation of both the proposed haul road <br />and the main. sediment pond (Pond 010).' This information <br />gathered was primarily intended for SCC design use. It was <br />submitted to the Division to comply with Regulation No. <br />4.03.1(1)(3) and to provide information to the Division <br />regarding they sections pertaining to cut and fill slopes. <br />The geotechnical report is presented according to the standard <br />of practice. The data, material properties, and analysis <br />appear to be correct. The geotechnical field investigations <br />and soil laboratory tests were conducted to provide SCC with <br />adequate so:Ll characterization to verify the proposed <br />structures could be constructed with adequate safety factors <br />and would bra stable. The results: of this geotechnical <br />investigation show this is the case. • <br />l0 <br />