Laserfiche WebLink
4. Rule 2.05.6(3)(b)(vi) requires that a plan for the restoration of recharge <br />' capacity be submitted. The Energy Fuels Corporation has submitted an accounting <br />of pre-mining recharge capacity and an estimate of how this recharge capacity <br />will be restored after mining is completed. The Division would like to see a <br />more quantitative description of post-mining recharge capacity based on site- <br />specific data collection Infiltration and aquifer testing techniques should <br />' be applied to existing reclaimed spoils to determine if restoration of recharge _ <br />capacity is possible at the mine site. <br />' Response: As described on pages 2.05.-111 and 2.05-112 of the application, <br />' recharge capacity will not only be restored but also enhanced by surface mining <br />and reclamation activities. To document [his estimate of post-mining recharge <br />,Sy capacity, CYCC will commit to install and sample a monitor well in the spoil at ~10j~~r;,~ <br />'oy~„J ~~ Energy Piine No. 3. Page 2.05.-104 has been revised to include this commitment. ~e~j~s.~ <br />`I"~ (See page 2.05-104a and 2.05-104b). <br />5. Rule 2.04.5(1) requires that a description of ground water quantity and <br />~~i-d quality within the general area of the mine site be submitted. To be in com- <br />pliance with this rule, Energy Fuels should submit a quantitative estimate of <br />' the amount of water that is pumped daily from both their underground and surface <br />mining operations. Also, the chemical quality of this pumped mine water should <br />be determined. <br />Response: The requested information is contained in the application as <br />referenced below: <br />' Quantitative estimates of water pumped daily from underground operations - <br /> page 2.05-109, Fig. 10. <br />' Quantitative estimates of water pumped daily from surface operations - <br /> page 2.05-108. <br /> Quantitative estimates of water pumped daily from surface operations - <br />1 page 2.05-108. <br /> Chemical quality of pumped mine water - pages 2.05-101 and 2.0 5-113 <br /> thru-115. <br /> <br /> -5- <br />1 <br />^ <br />