My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10132
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:33 PM
Creation date
11/19/2007 2:08:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Application Correspondence
Doc Date
4/9/1982
From
WESTERN ASSOCIATED COAL CORP
To
MLR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />k. Ground l•!ater lnflor, <br />, <br />i~ <br />u <br />Predictions of gr-ound water inflov+ to the Red <br />Canyon Itine v+ill be rude using the transmissivity, hydraulic gradient, and vertical <br />permeability values determined in Task I. Documented calculction methods gave <br />been selected to consider inflow to the mine via the adjacent coal seam and the <br />mine roof (overburden). The calculations will reflect any boundary conditions <br />revealed during the pump testing. It is occur <br />vrhere the glacial alluvial a uif }a-r=i~iliel~ mine <br />is near tiK• coal subcroo winrh i-s dime-t-lv iru~~~t-~~-+r~u ~•:aiPr tahlr- aqui~_ <br />The quality of the mine inflov+ v+ill be established during the on-going mine <br />inflow monitoring program described in ~ppendi>; (,. Tiie rate of inflow infor- <br />oration collected at the Red Canyon Kline has indicates'. that approximately 11 <br />gal lens per rinute is being encountered at the mine presentl~~. This information <br />Trill be used as a check on the outcome of the inflov: calculations. <br />C. Ground ':later- Drar:~down. The reduction in potentiometric head and/or <br />v+ater table elevations associated with pumping of v+ater from the Red Canyon t4ine <br />will be calculatcci for various ground o-:ater systems in hydraulic connection with <br />the D and E Sean operations. 'he projected mine inflov+ rate r:~ill be used to assess <br />the e>:pected drar:~downs in the coal, overburden, and glacial alluvial aquifers. <br />The signifrcance of the projected drav:downs to vegetation and to surface r~~:'ters <br />rill be assessed in the surface water and alluvial valley floor potions of <br />the effort. <br />C. !'ost-Fiininq Ground t:'ater Conditions. The post-mining r:~ater levels in the <br />mine will be predicted based on the observation w^lls and the conditions present <br />within the mine and at near-by mimes. The post-mining v+ater quality will be deter- <br />mined from analyses of mine water from the old Red Canyon J~ine r:~orkings. The <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.