Laserfiche WebLink
Suitable topsoil Material Hvailability <br />f-~pprrn:imatel.y nr!e-half (.4~' acres) of the disturbed area above <br />Road 117 has 6 inches of original sr.ritab]e material that was <br />never moved. Ihi= is approx~.mately `;'1:;'~ cu.. +t. <br />11-!+:: lower far_i:li.ties area. adjar.:ent to Fc•i.+rmile Creek, I~as a <br />t.hick:nee.s o{ above 2.U •reet o{ clay .loam material. 5tri.pp?nn <br />this material over 0.6 acres in the ir.!wer area wi.la result in <br />5:':e'JrJ cu. +{... o{ t..opsni 1.. lliei`e{nre the total amount ava~i lahl e <br />is 61.4':' ni. {'t. wl'uch is more than tF!at requirerJ +or' <br />reclamation. <br />f;ui tab! e t..opsoi 1 matrrr'i a.l tt'iat. <br />not to b~~ i.mn!edi atte]. v c.+sed wi l d <br />rr~clan~,atior~ neaar Sediment Pond Ii <br />1. lhie st:ock:pr.le wild contain <br />and wi 11. be cony-.tr+rcte:d to verv <br />will not e::cer=d 9.0 feet. ibis <br />3r! days a+ter its construction. <br />topsoil. mat.er'i.al. from i:hc: lower <br />undist.:r.u-bed material ad.acent to <br />la!?or'akory fc?r' cornplei:e ar~alvsi=_ <br />the Division as soon as they are <br />is s.t:ripl:ied +rom the lower ar-ea <br />be stoi::l:piled fcr final <br />as s~F+own on the encluse.:d M~+p no. <br />appro;:i.mat:el.y 1:70 cubic yards <br />mi 1 d sl ape.=_. Height of tt!e:~ pi ] e.: <br />st:or_I::pile 4!111. be seeded wi.tt?en <br />Sampl.ee: ni H) t.F!e• suitable <br />benc:F~ area; and Bj the <br />the minesito have been scant. to a <br />f:esults will. be submitted to <br />received. <br />V. CI1A1'JGE: i TO THr_" IMINE. F'I..AN <br />The rnai.n purpose of this revision is to make changes to the minc- <br />pa.an. ll~!e si.nglE--car hoist system gr~~e•atly limited the aimouni: o+ <br />coal that cor_rld be. produced at. t: tie site., iiy utilizing a cha~.n <br />conveyer haulage sysi:.em, the mine proda~ci:i.on rate= can be <br />c;irlr~ificantly ir~crea~~eri. <br />l I've ~:.;; i sti nq tan ai the 1 ower poi" t_al area wi 1 1 be remove?d and <br />i.nsta.l~led a.t: the rspper portal.. the lower' portal will then be <br />r-iced to provide ii~ta4ie air, men and mat er~i a] transport and coal. <br />transport 'Lo the s+ar f--ace via t:he ~4 ~.nch chain conveyer-. <br />H si r!ql e entry ? n the "1:)" seam wi 11 he driven fr-orn the 1 dwer <br />porl:al at an 1i=1 degrees or ]9 degrees angle between siriE:e and <br />di.p which will interse:c.t: the existing wark:s in the "U" seam at <br />t.f?eir~ 1c?west 1;oir~t. Unce i:he connect. i.ar-~ is made, a three entry <br />prodr_rc. t i on panel wi .I. 1 be dr-i ven at a "<D% grade downdi p ar!d <br />crosscut=_ will 6e driven 20% updit as shown on E>;hibit 1. <br />H ~:lei~i~r~ey L..1C!Cr miner w?th two auger heads will be used to drill <br />I-!oles in the tare far shooting. After' blasting, a small. Eimco <br />93`i loader w?.11 transport the coal to fire chain conveyor +rom <br />wl-rich the coal will hat.rl.ed to the surface. <br />8 <br />