Laserfiche WebLink
STATE OF COLORAfJO Rif,MnRfl D.M. i~nvr~~n n. III IIIIII III IIII III <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Executive Director <br />MIlVED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (300) 866-3567 <br />David C. Shelton <br />Director <br />The water available for flood irrigation is not suitable for flood <br />irrigation because of its quality. Water of a similar quality is <br />not used regionally for flood irrigation. <br />The soils in the area under consideration are not suitable for flood <br />irrigation. Those soil types are not flood irrigated in the region. <br />The areas under consideration are topographically or geographically <br />different from the areas in the region where pond/ditch flood <br />irrigation is practiced. That difference makes the areas under <br />consideration unsuitable for this type of flood irrigation. (For <br />example, the area under consideration is significantly smaller in <br />acreage than the areas where such flood irrigation systems are used. <br />The areas where such systems are used are all at a lower (or higher) <br />elevation and that the difference in elevation makes these areas <br />not useful agriculturally. The areas flood irrigated by such systems <br />are located within 5 foot elevation of the stream channel, and if the <br />same limitation is applied to the area in question, the acreage <br />remaining is too small to be agriculturally useful.) <br />DATE: <br />T0: <br />FROM: <br />RE: <br />January 6, 1983 <br />Sandy Emrich <br />Jerry Zimpfer <br />Foidel Creek <br />~~~~ <br />Underground <br />Mine, AVF Determination <br />In thinking about yesterday's meeting with Getty Coal I realized that I did <br />not fully respond to George Young's question concerning what additional <br />information could be provided to change the preliminary Foidel Creek alluvial <br />valley floor determination. The following discussion should provide the <br />company with some guidance, and should be forwarded to the applicant. <br />Information included in the application indicates that the area in question <br />(Foidel Creek) is capable of flood irrigation because sufficient water is <br />physically available, but that flood irrigation would not be economically <br />feasible. This area should not be given a negative determination on the <br />basis of economic feasibility. Cost-benefit analyses are too dependent <br />upon the particular scenario analyzed, and too easily ad,}usted to provide <br />the desired results. There are, however, other physical considerations, <br />other than the quantity of water available, that could be considered. <br />