Laserfiche WebLink
<br />'thirdly, the operator should determine exactly how the existing waste <br />pile has been constructed. Specifically, whether or not a subdrain <br />exists which conforms with the recommended design configuration. The <br />existence of such a subdrain will have to be certified by an appropriate <br />professional, preferably Rocky htountai.n Geotechnical Inc. <br />With the resolution of these three remaining deficiencies, the proposed <br />reconstruction plan for t}ie coal processing waste pile at the Dorchester <br />No. 1 mine should be acceptable. Construction of a pile in conformance <br />with the recommended design and construction specifications will satisfy <br />the requirements of the permanent program regulations, following the <br />resolution of the three remaining deficiencies. <br />/ep <br />cc: );d Bischoff <br /> <br />