Laserfiche WebLink
iiiiiiiiiiuiiuiii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmenl of Natural Resources <br />1313 Sherman 51., Room 115 <br />Denver, Colorado 80203 <br />Phone: 13031 866 3567 <br />FA%~O031 A32-P106 <br />November 18. 1996 <br />Mr. Jim Stover <br />J.E. Stover and Associates <br />2768 Compass Drive, Suite 101 <br />Grand ]unction, CO 81506 <br />~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Ruy Romer <br />Governor <br />lames S. Lochhead <br />C.rcwive Dueaor <br />Mii hael B. Long <br />Dimsmn Duecmr <br />RE: "Additional Geotechnical Study, Evaluation of the Stability of Reclaimed slopes, Bowie No. <br />2 Miue, Bowie, Delta County, Colorado" -Permit No. C-96-083 <br />Dear Mr. Stover: <br />The above-referenced additional geotechnical study has been reviewed by Jim Pendleton, and [he review <br />comments are presented below. The study was prepared by MAXIM Technologies, Inc., a geotechnical <br />subcontractor to Morrison Knudsen, the primary design contractor for Addington Resources. The study <br />was prepared to address adequacy comments included in our review memorandum addressing the original <br />Maxim Technologies Geotechtlical study, dated August 4, 1996. The study was submitted by J.E. Stover <br />& Associates, the permit consultant for the Bowie No. 2 Mine. <br />General Comment <br />The Maxim Technologies additional geotechnical study evaluates one specific aspect of the previous <br />geotechnical adequacy concerns. It addresses the stability of reclaimed bench cuts backfilled with on-site <br />materials, and it provides the results of a one-hole boring program, including laboratory characterization <br />of the soils and bedrock encountered in that additional boring. The study includes analyses of two of the <br />highest cuts proposed a[ the site, those of the stockpile bench and the portal bench. It provides general <br />recommendations for the design of reclamation fills at the Bowie No. 2 Mine, based on these general <br />analyses. It does not, however, provide significant information regarding the reclamation of specific cuts <br />and fill benches at the site. It may also be limited by its analytical assumptions. <br />The Division cannot approve any mine permit until the applicant has demonstrated that the mine site <br />disturbances can be successfully reclaimed. Unravelling, meta-stable backfilled slopes do no[ represent <br />successful reclamation and cannot be judged by the Division as meeting the mandate to return to the mine <br />site to a beneficial use. The initial geotechnical adequacy comments generally expressed concern that <br />insufficient geotechnical information had been provided with the application to demonstrate that the site <br />could be reclaimed in a stable configuration. The original Maxim Technologies study, while it presented <br />wnsiderable viable geotechnical information, did not solve this inadequacy. The supplemental study <br />provides additional useful information; however, it leaves many of the earlier geotechnical concerns <br />unaddressed. <br />