Laserfiche WebLink
h1r. Richard Domirl~fr • <br />Stipulation Responses <br />OcCober 27, 198]. <br />Page Nine <br />Stipulation: <br />22. Continued <br />results of the analysis shall be submitted to the Division for <br />review anc] approval annually. Wyoming fuel Company shall con- <br />tinue this analysis on an annual basis until L-he Division <br />approves its cessat.i.on in writ.iny. Should these determinations <br />descern any inaccuracy which affecCs the abi].iCy of the Company <br />to achieve the projectCd post-mininrl tohogr.aphic configuration, <br />then the Company shall revise the mi.niny and reclamation plan <br />appropriately. <br />Wyoming I'ucl Company Response: <br />layoming Fucl Company ~:~ill provide on an annual basis maps, <br />reports and results Prom survcyinrl to verify the accuracy of <br />the projected 47, overall overburden sre1J [:actor, This analysis <br />will continue until the Di.visi.on trphroves its cessation in <br />writing, Should any discrepancies be n~Led iJyominrl fuel Company <br />mill revise Lhc min.iny and rcc.l:~mnCion plan as needed. <br />Stipulation: <br />23. Prior to the initiation oP any mining activities .in the Phase <br />Ix area, e::cludinn topsoi]. remova], l•ayoming Purl Company is <br />directed to submit an a[+p].i.caCi.on Eor techn.ica7. revision o.C <br />the application provi.d.iny inform-~Li.on conccrniru] the ].oc,ntion <br />configuration, method of placement and sediment control system <br />for the proposed stockpile for Phase IY, overburden. hlaterial <br />shall not be e:;cavaCed or placed in the stockpile until soritten <br />approval of the technical revision has been granter] by t-he <br />Division. <br />Wyoming Puel Company Response: <br />Prior to the constructial of the overburden in the Phase I~ <br />area, excluding topsoil removal, i•]yominy Fucl Company will <br />submit an application for technical revision of the application. <br />The technical revision will provide information concerning the <br />location, confiyurat.irnt, method oL placement and scd.i.ment con- <br />trol system for. L-he proposed overhurc7en stockpile. Placement <br />will not begin unlLil wriCtcn aphrovn]. of the tcchni.cal revision <br />by the Division. <br />Stipulation: <br />24. Wyoming ['uel Company will provi.dc designs for improved inlet <br />configurations and/or inlet structures to all of the road <br />culverts, which t~i..ll reduce the tendency Eor the cu],vert mouths <br />to become filled with sediment •~nd c]ebris, within 90 days of <br />permit issuance. <br />