Laserfiche WebLink
i4r. Richard Dom.i.~~: <br />SCipulati.on Rcs~~ r,, <br />October 27, 17£31 <br />Paye four <br />Wyoming Fuel Company Response: <br />Sti <br />8 <br />Wyoming Fuel Company will provide the Division with a water <br />quality report by October 30, 17A2. The report will include <br />two samples at l.cast one week apart during spring runoff (if <br />in fact there is runoff) anc] ttao storm events. Samples will <br />be taken from established surface water. monitoring locations. <br />Standard reporting procec7w:cs will be emp.l.oyed. A11 parameters <br />with the e::ception oC Sulfide will be reported as noted on <br />Paye 2 of the List of Stipulations For Plyominy Fucl Company - <br />Canadian Strip hlinc, File Ido. C-02G-81. <br />ation: <br />Wyoming Fuel. Company wi.]] pr.ovide a revised G>:h.ih.i.t C-2 which <br />clearly shows the location of l•]cl.l 7 within 30 days oC permit <br />issuance. <br />Wyoming Puel Company Response: <br />Wyoming Fuel Company has rev.i.sed 13~hibit C-2 clearly showing <br />the location of Well 7. 'this e,:hibit is attached. <br />Stipulation: <br />9. Wyoming 1•'uel Company must l~roviclr: nicosur~~mcnCs of: toCol dis- <br />solved solids (rue;/I,), and socl.iwn absorption ratios, as well <br />as a.ll reyuiremenCS oC t-he tJPUES s•,-stem f:or each di.scharyc <br />event at Pond No. 9. These reports must be submitted to the <br />Division quarterly. <br />ldyoming Fuel Company Response: <br />Wyoming Fuel Company will provide the <br />meats of TDS and Sn12 as well as NPDi;S <br />a quarterly basis. TDS and SIaR values <br />if a discharge is recorded during the <br />SLi.pulaC.ion: <br />Division with measurc- <br />data from Pond No. 4 on <br />will only be reported <br />quarter in question. <br />10. Within 120 clays ol.` I~vrm.il. i.:;sunncr, ,.-ind pr.i.or to any o;_~crati.ons <br />in Phase VII other than topsoil salvage, CJyominy P'uel Company <br />must do one of l-he follo~.aing: <br />1. Prov.i.de a plan Cor. recovct:y of suFCici.cnt topsoil material <br />to cover soilic ovorhur~ICn Co ~+ depCh of three Cer_t; <br />2. Provide a plan for handlinG overburden which demonstrates <br />that no maCcrial with an S~'1R over 10 twill be placed ciithin <br />3 feet of the soil surface. Such a plan should include a <br />cnethodoloyy by which I;~yomi.n~l Pur_.l Company can assure <br />operator conq;laincc; <br />