Laserfiche WebLink
i•Ir. k.ichnrd I?oini~ • <br />Stipulation I?csp cn <br />October 27, 198.1 <br />Page Two <br />Stipulation: <br />2. SVyominy Fuel Com{)any shall provide. certification, in the form <br />of a letter signed and sealed by a registered professional <br />engineer, that Pond No. 4 and '1'empor.ary Impoundment No. 1 were <br />constructed as her the approved designs within thirty days <br />of completed construction. <br />Wyoming Fuel Company P.esponse: <br />FVyominy Fuel Company will. pr.ovidc in the form of a letter <br />signed and sealed by a reyi.stercd professional eny]neer, that <br />Pond No. 4 and '1'cinporary ].mpoundincnL: No. .1 were constructed <br />as per. the approved designs within thirty days of completed <br />construction. <br />Stipulation: <br />3. Within 30 clays of: {~ermiC issuance IVyominy Fuel Company must <br />provide: <br />1. Proof that- stor.agc rights have been a{~hlicd for in State <br />Divisiat 6 plater Court and provide a means of: dewateriny <br />Temporary Lmpoundment ido. 1 to a volume less L-han two <br />acre-feet in the c~venh. of a doamstream call , c.rr. <br />2. Design for a ditch collection system, which w.i11 eliminate <br />the need for 'temporary ImpoundrncnC No. 1. This design <br />shall include all assumptions, methods and calculations <br />necessary to assure compliance with 4.05.3. <br />Wyoming Fuel Company Response: <br />Wyoming Fucl Company will within thirty days of permit <br />issuance provide proof of application with State Division G <br />Water Court for ~:~atcr storage rights for Temporary impoundment <br />No 1. Li the event of a downstream call the impoundment will <br />be dewatered to less than t~ao acre-feet volume by pumping. <br />Stipulation: <br />4. Wyoming Fucl Company must provide: <br />1. L].I11I1~ of diversion ditch P. upon construction with com- <br />pctent rocl: rilrrap with a D50 of not less than sir, a.nr_hes, <br />or <br />2. n design for a diL-ch collection system, which will elim- <br />inate the ncerl f:or 7`cmhorary Impoundment No. 1. and thereby <br />reduce the des].yn floe, for Ditch t; to the ].0-year, 24-hour <br />storm pea}: .flow. 'Phis design shall include all assumpL-- <br />ions, methods and cal.culati.ons necessary to assure com- <br />pliance with 4.05.3, and shill be provided to the Division <br />within 30 days of permit issuance. <br />