Laserfiche WebLink
• Hill Top No."3. <br />zinc and''iran'in''a lime gangue. The ore ie sorted into <br />two olaese,e (i e) lead are which rune appraximately;6/100 <br />oz: gala, 20 oz'. silver and 20~ lead and ie shipped to the <br />Denver Smelters,' and zinc ore whioh averages about.38°/, <br />zina and is shipped to Iola, Raneae.. A monthly tannage' <br />aP about 200 tans is made. <br />WORKINGS. <br />The main shaft which is 4•x 8 in the clear is 540 feet <br />deep with a•level at a depth of 480 Peet dnd_a level at the <br />a <br />Ibattam of the shaft. On esoh level there are several <br />hundred feet of drifts, upraises and et apes, while an <br />incline shaft from a paint same dietanoe Pram the main. <br />shaft resahes to a depth of 600 feet. <br />The workings aro oannected with the Last Chanco Shaft, <br />at a paint 66 feet Pram the surface, the Dollar of whioh <br />shaft•is 200 feet lower than the aall~f the main shaft. <br />Goad ladders are maintained in the Last Chanoe Shaft but <br />there are no ladders in the main shaft. <br />At the present the old dumps an the prspgrty era being <br />handled and sorted for the high grade aarbanate of zino <br />they oontain. - <br />EQUIPMENT. <br />The equipment an the property oansiets of shaft house, <br />ore house, engine room, blaakemith shop, powder house, <br />basrding hauee, offioe and stable. At the mill there are <br />also basrding hauee and•bunk house. <br />The engine roam oontains an 8 x 10 - 36 H.P. engine <br />and Friction hoist, a 40 H.P. bailor, whioh is oarrying <br />80 lbs. pressure, and-the usual equipment of gages,, <br />indioatore, eto. <br />The shaft ~a equipped with Leadville Type sago with <br />ohaire and olutohee. The hoisting aablo is 3/4 in. etoel <br />oable, whioh has been in'uee Pour years but io well oovered <br />with cable dressing and eeome to be in goad shape. <br />Tho ehiove ie 30 in. iron ehieve and le situated 26 feet <br />abovo the Dollar of tho shaft. The boll oord ie woven wire <br /> <br />