Laserfiche WebLink
P.S I N •I R G ( Continued, ) <br />I' The aethod•of ore extraction is that of drifting on the vein, <br />Single hand drilling, -The r~ethod of timbering is that of drift sets <br />at present. Sufficient. ;}lo timbers used aro whito epnnce prepared <br />by hand ~S'mine and aro in good condition. <br />Underground tramming is by manual labor,using ateol bucket and truck <br />Trackage 18 in. guage and 12 lb rails. <br />Amount of water dealt with in gals per minute amaximim 40 gals. <br />Steam pump being employed. Capacity and distribution of pumping <br />plant is 65 gals per minute. <br />Vent illation is natural and sufficient. fioxious gases aro not met <br />with. Sanitary conditions are good, All. o].d timbers have been ro- <br />moved from underground Workings wgerover necessary. <br />The shaft is divided into two compartments,with bucicr..t way and lad- <br />der way. The ladders are safe,aocure acid accessible. <br />Ladder way contains staeam and Water papa. <br />Landings are provided in ladder way not to exceed 20 Pt apart. <br />%i'here are no winces or mnn ways connecting levels, <br />The mine has but one exit for employees. Second exit in course oP <br />construction, Lighting underground by candles. <br />S T A T I S T I O S, <br />Development <br />Total No. ft in shaft 425 ft <br />Total No, ft in tunnel 70 ft <br />Total !Jo ft in driftsor levels 200 ft <br />Total. Ito ft irc cross-cut 60 ft <br />Total No ft in dovelopment wort. 755 ft <br />GENERAL RE?dA K KS , <br />', No persona under the age of 12 years are employed on the mine. <br />~! All ahafts,pite or other excavations on the property are securely <br />covored or feneod, Strangers or visitors are not rtllowed under <br />i ground unaccompanied. <br />I <br /> <br />