Laserfiche WebLink
,,t 17t I t•. c . lcon~iriuea:i' <br />Steel bucket and truck are used on lovol. TrrekaFe lA in. gaugo and <br />1G lb rails. <br />Amount of water dealt ;With in gals por minute,Llaxiorum 15 gals. <br />System employed st-.eam pump. <br />?'he ventillation is natural and sufficient. Iioxious gases are not <br />nit with.. <br />Sanitary conditions are good. All old timbers have been removod <br />from underground •norlsings :chorever necessary. <br />The shaft is divided into two compartments,•nith ladderaray. The lnd- <br />dens are safe,secure and accessible. <br />Ladder way contains stae~m and :cater pipos. <br />Landings aro provided in ladder way not to exceed 20 ft apart. <br />There are no winzes or man ways car :octing levels. <br />73ine has but ono exit for employees. <br />Lighting underground by candles. <br />S T A T I S T I C S. <br />Production, <br />Average tonnage por month 100 tons <br />Devolopment, <br />Total I7o ft in shaft I00 ft <br />Total ilo ft in level 145 ft <br />Total P:o ft in devolopment :•rork <br />245 <br />ft <br />7den employed, <br />10 '.liners $3.50 for 8 hr shift <br /> <br />$3.00 ° <br />?. Trainers <br />1 Topman "3.00 ° <br /> <br />4.00 <br />2 F.nginocrs $ <br /> <br />4.00 " <br />l Blacksmith $ <br /> <br />4.00 <br />1 Forecsan $ <br />p <br />1 Superintendent 56.00 <br />Cost, <br />Cost o/'.'fuel $ $17..00 por ton <br /> <br />cr month <br />Average cost fuel p <br />$3 <br />.00 <br />t <br /> <br />