Laserfiche WebLink
MINING AND MINE METHODS. <br />main opening consists of tha Pottrth of Jttly shnft,5'::10',two coo- <br />~ SZr <br />nent(bucY.et and lndder),dipping to S.il.at angle of (t0°. Depth 400 ft. <br />ft has four levels,tho first and second of vrhich stn only a short <br />wrest of the shaft and fros, erhich a small nr.touat of stoping <br />been done. <br />?'he t}tird level exteruis 50 ft.east of shaft and nbout 2U0 ft.vrent <br />f nhaft.Considernhle. moping has been above third level went of shaft. <br />T}tc fourt}t or lovrer level extends a short distance east aC shaft <br />about dA0 ft.vrrnt of sar..e cormecting vritl: the Pease i:ansas workings <br />vrin~e and crone-cut. Considernblo moping itns been dono nbove Courth <br />Brent. <br />All of the above cror}:ingn are on t}:e Fourt}: of July boin. <br />Ifointirtt; done b? bucket attached to 3~4° steel cable in fair con- <br />ditioa, l'7t.ot load itoidted lOGU:r.Distance hoisted 400 ft. <br />ine net}:ads- Drifting and overhand stoping. <br />'u:,J ~;imbering- Stull and net,un~ng rod npruca and pine. ine tinbe.t•ing id I', <br />and drifts in in bad condition and needs itvaediate attention. <br />Auc}:et and trollr._:. <br />{later bucket. <br />ion-Fatural due to corutection with Karnan.uor}sings. <br />Sanitary condition.^.- Fnir. <br />);zits-Fourth of July shaft and connection vrith Penne }'stnnas. <br />The ladder road in the Fourth shaft is in bad conditior. and should <br />ha•}v~e~ immedia~tef~attention. , ; - ` <br />1 G fi~ ~s}7`"~~i~`locate~tit ~3~}rkeetGti4estjof ,j~t'nT6tiY't}r~uly/ 1~.~'""F`Vo <br />sltii~tftv5',X10~ in~c},ear;;5~'f#o3s•~up~sun}.ionXAvo~t vein. <br />The }:lay~ower sh~rt~is,~.ocated near the tsost,end~,of t~iPj„~ayfl~axe~~~ q~C%1~ [,~ <br />~' ~ <br />lode; lUU Ft.deep sunk on the Liayfloerer ieirt. <br />~_ <br />