Laserfiche WebLink
" StA71STICS:-°~" <br />9 <br />DEVEZOPP~NT . <br />Total number oY Yeet in sha£ta, 300, Cost per Poot, $25.00 <br />~ ~, „ driYts,631.5, 10.00 <br />cross-cuts, 60, ,. 12.00 <br />.. „ .. „ <br />+ 12.00 <br />winze 10, ,,. .. <br />., <br />„ „ development 1,001.5 <br />I:~N EIlIPLOYED. <br />3 tSachine drill men at V3.50 per day 8 hours. <br />2 ISiners 3.00 " 8 " <br />1 Timberman 3.50 ,. 8 +, <br />1 Trammer 3.00 ,. 8 +• <br />1 Ore sorter 3.00 " 8 " <br />7. Top man 3.00 „ 8 ,• <br />1 Engineer 4.00 „ .8 ++ <br />1 Blacksmith 3.50 ,. 6 ++ <br />1 roreman 4.00 ,. 8 ++ <br />1 Assayer $75 per month _ <br />l Superintendent. <br /> <br />C 0_ S T S• <br />^lood per cord, $4, Average cost per month, $120.00 <br />er inch, ,. „ 20.00 ~ <br />Timber, 12 ets. p <br />45.00 <br />Powder, 15 cts. lb. +• " " <br />Cost transporting ore, 75 cts. per ton to mill, <br />$1.50 per ton to Black Hawk. ~~_, <br />"~ I <br /> <br />