Laserfiche WebLink
production. <br />STATISTICS. <br />Gross tonnage for ,year, 93,600. AveraF;e tonnaF;e per month, 600 at <br />-present. _. <br />Development. <br />Total-feet in shafts, 1,600. Cost per foot ,x40.00. <br />Total feet ,in tunnels or ad its, 250. Cgst par foot ~g.00. <br />Total feet in driYts or levels, 16,000. Cost per foot X4.00. <br />Total feet .in cross cuts, 2,000. Cost per foot X4.00. <br />Total feet in vrinzes and raise a, 2,700. Cast per foot 53.85. <br />Total feet in development, 2^,;550. <br />e 1' <br />14 machine drillmen, <br />4 machine helpers, <br />5.miners, <br />4 timbermen, <br />12 trammers, <br />9 ore sorters, <br />2 top me n,• <br />1 shift boss, <br />2 engineers, <br />3 firemon, <br />2 blacksmiths, <br />1 blacksmlth's helper, <br />1 boss in ore house, <br />1 assayer, <br />1 Yoremsn, <br />1 office help, <br />peen employed. . <br />m! ;4.00 for 8 hour shirt <br />3.50 " 8 " " <br />3:-00 " B " " <br />3.50 " 8 <br />3.00 n g u n <br />3.00 ° 8 " " <br />3.00 " 8 u n <br />4.50 n g u n <br />4.00 " 8 " <br />3.50 " 8 " " <br />x.00 " 8 " <br />3.50 " 8 " " <br />4.00 '! 8 " <br />ip100.00 per month. <br />200.00 per month. <br />100.00 per month. <br />Average number of men employed for tho year 50. <br />41 underground and 22 on surface. RAP:-a>~ <br />Costa. <br />Cost of fuel, X4.75 pox ton. Average cost per month, ~G00.00. <br />iAvorage cost of. timber per month `90.00. ti <br />Coat of steel, ~p8.45 pox 100 lbs. Average cost per month, $y80.00. <br />Cost of oil; 65~! par-gal. overage cost per month, p40.00. <br />Cost of povtder, ~p12.45 per curt. Average cost per month, 5"y1000.00. <br />Average assay value, ore per ton, 730.00. <br />Coat per ton, mining of ore X8.00. <br />Cost per ton treat°uent of ore, ineludinl; tranr:portation, 8.25. <br />