<br />STATISTICS.
<br />ucka, The
<br />ne and Smelt_
<br />Gross tonnage, 3,000, Average tonnage per month, 350.
<br />ses, and Development.
<br /> Total feet in ehai'te 459. Cost per foot 5$1A
<br />00
<br />
<br />Total ft. in drifts. or levels, 140.
<br />Total ft
<br />in cro
<br />' .
<br />..
<br />Cost per ft. 5$D.00.
<br />
<br />trd vrork- .
<br />ss. .cuts ,
<br />450; Host
<br />Total ft. ir. winzea and raises
<br />75 per root 5$8,00.
<br />C
<br /> ,
<br />,
<br />Total ft. in development, 1,124, oet per foot, ?$12,00.
<br />•ovided DA.en employed.
<br />•wa~• Her- ~ munhi,;e dr311ma n, y ~4, gU
<br />i i'or 8 hour s_n ii't
<br />
<br />2 mach
<br />ne helpers, 3.50 .
<br />" B '~ n
<br />not to 10 miners, 3.00 ° A " "
<br /> 3 timbermen, 3,50 " 8 ° "
<br />onriecting 4 trammera, 3.00 ^ 8 " n
<br /> 1 ore sorter, 4,00 „ D ,,
<br />ladders, 1 topman, 3.00 „ B
<br /> 2, engineers, ;}..00 „ D „ „
<br />he 245ft. 1 blacksmith, 4.00 " 8 " '~
<br /> 2 foremen, 4. 5U „ 0
<br />s is read- 1 Supt.. owner in lease.
<br /> 1 bookkeeper 5p50.00 per month.
<br /> 1 vr;_tc?:man, 5j3.50 for B hour shift.
<br />Les. Average number of men employed for the year, 20.~
<br /> 16 wtderground and 4 on surface.
<br /> Cost..
<br />Coat of fuel, ^$6.50 per ton, Average coot per month, ;"160.00.
<br />Cost of timber, 22.00 per M. Averal;•e coat per month, 5p100.00.
<br />Cpet of steel 9~ per 1b. Averad;e coat per month, 5$0.00.
<br />Coat .of oil, 65~ per gal, P.verage cost per month, 5$6,50
<br />Coot of powder; 5$14.45 per cwt. Averap;e coat per month, ?$400.00.
<br />Average assay value ors per tmt, .ny200.00. Coat per ton mining of
<br />ore 5$6.00..
<br />Cost per ton transportirtp; ore, by wagon 65j!, Dy Railroad, 75P!.
<br />Cost per ton treatment of oro i'ro, X7.00 to j15.00, cr an average
<br />of ;12.00.
<br />55me coat 5$93.00 per ton for tran:;portinp; and treatment.
<br />
<br />
|